Tuesday, July 31, 2012

Rough Sketch Trackplan

Here is a current sketch of some ideas for the train room. It includes:
  • 2 level offline staging yards that would be the same size.
  • Continuous loop on the upper level
  • Upper level major attraction is the small city East McKeesport switching
  • Lower level has the Irwin Yard and Herminie Mine attractions
I don't have any sort of interchange which I am willing to sacrifice if it does not work.I liked having an active P&LE line that provided some switching as well as the interchange but I could do a static interchange where the cars are positioned for pick up at the beginning of the operating session and drop offs "leave" the layout between the sessions.
Lower Level

Upper Level

No comments:

Post a Comment