Part of what I need to plan for is that fact that I am moving into the scenery phase of my layout. Over the last week or two I managed to lay ballast between ties on about 1/2 of the layout. This weekend I was able to ballast the sides of all the track in Penn Hills and Hermine. My next blog post will be describe the 3 step process in more detail.
The big thing I did this weekend was install the first - and the anchor - scenery divider which runs diagonally down the peninsula to separate Penn Hills (left) from Hermine (right). There will be another scene break hiding the mainline tracks along the back wall next to Penn Hills.
All track on peninsula ballasted and scenery divider installed |
No comments:
Post a Comment