Wednesday, March 14, 2012

Operating Session Countdown

Well, the house is on the market and we have had some folks walk through but no offers yet. I have stopped working on the layout since I will likely end up cutting it up to take it out of the house and our next home won't have the same sized space, so only pieces will be reassembled. I have a list of ideas I want to do different, such as incorporating a loop of some kind for continuous running, but that is a topic for another blog entry.
Eric D. was over one night last week to run trains. I am starting to count down the number of operating sessions we can have before we turn the lights off for the last time. I managed to spend a little time setting up the sequence of trains and I focused on specific local trains with only 1 or 2 stops for Eric to alternative between while I again focused on working the Irwin Yard and some local extras that originated from Irwin like the mine shifter.
Overall, it went extremely well!

TR-49 Westbound (Engine 8805) through to Pittsburgh, single stop in E. McKeesport to pick up cars on the P&LE Interchange
  • Irwin trick set out cars for Greensburg for TR-60
  • Run light to Herminie to pick up hoppers, HMR-1
TR-60 Eastbound (Engine 8604) local dropped cars in Irwin, pick up cars bound for Greensburg
  • Irwin trick sort cars from Herminie mine run
  • Irwin trick sort new cars from Pittsburgh TR-60
P&LE run leave cars for PRR (both from Erie and local pick ups) and take back to Erie any cars bound
  • HMR-2 mine run to drop off cars
  • IR-1 exchange cars at Heinz and LAS Fabrics, drop offs and pick-ups as necessary
  • Sort new cars from IR-1
  • Set out cars bound for Pittsburgh
TR-61 Westbound (Engine 8604) pick up & drop off at Irwin yard, continue to Pittsburgh
  •     Irwin trick sort cars dropped off by TR-61
  •     Run light to E. McKeesport and get P&LE Interchange cars
TR-62 Westbound (Engine 7046) local from Pittsburgh, pick up Irwin Industrials, drop off cars in Irwin yard, continue to Greensburg
  • Irwin trick set out Greensburg bound cars
  • Irwin trick run out and drop off Irwin Industrials, and E. McKeesport exchange cars - West Penn Power, P&LE Interchange
TR-47 Westbound (Engine 7046) Thru to Pittsburgh

TR-52 Eastbound (Engine 8805) Thru to Greensburg

Eric was having some problems correctly aligning the switches, even though I have the handles painted white for straight and red for curved. I think I will add mock white milepost signs on the straight track as a visual clue for the operators.

I hope we can get another operating session next week!

Saturday, December 31, 2011

PRR Tool House

I was cleaning off my desk from building the cabin cars, putting my tools back on the rack behind the desk and washing all the graphic off the cutting board when I discovered the American Model Builders PRR Tool House laser cut wood kit I had bought at the train show. I had hung it on one of the pegs on the peg board, then hung something in front of it and completely forgot about it. What a pleasant surprise!
Irwin Yard's new tool house, next to the old boxcar that formerly served as the shed.
 This is only my second laser cut wood kit - the outhouses for Vic's being the first kit - but I really like them. Nothing looks more natural for a wood building than wood. The style of the building is board and batton siding. I painted both sides of all the wood parts, with the the main pieces in Depot Buff and the trim in Roof Brown. Once dried, I began assembling the parts. The instructions recommended CA super glue (which I have) and an accelerator (which I do not) but I have always thought white glue was best for assembling wood projects. I tried both and no matter how careful I always get a little glue that dries on the surface. The white glue is clear to milky but the CA was shiny. After the first experiment, I stuck with white glue. This slowed my progress a little as I had to wait for pieces to dry but I did some other activities on the railroad like programming the new RS-3 and gluing some track to the B&O bridge (a story for another day).

Overall, it took me an afternoon of one day and a morning of the next before I placed the kit on the layout. I am very pleased with how it turned out and once I add a couple of figures moving around the scene, some tools and materials near the building, and maybe even a table saw visible in the window, it will look very realistic. I do need to tone down the grass in this area and make it more dirty and stone.

I think I am ready to tackle building a row of identical company houses for the Herminie mining area. I have my eye on the 3 pack kit from City Classics but I am still looking.

Sunday, December 25, 2011

Christmas and Cabin Cars

Lisa gave me a Bachmann RS-3 that I have been wanting. I've always liked how the RS series looked and the model from Bachmann is very well detailed, nicely priced and comes ready to run for DCC layouts. I ran it on the track a few times, solo and then pulling a west bound freight train, using the default 03 address. I still need to program it to respond to the engine number, 8604.
Irwin Yard's newest engine, and RS-3, grabs a car from the cabin track for the next outbound train.

I spent the rest of Christmas afternoon finishing the four cabin car (caboose) kits from Bowser. I really like the price and details on these kits but they are tough to build! The ends are thin plastic that have to curve a little. I was getting a bit frustrated, breaking the small pieces but finally figured out that if I mounted them into the roof first, then I could attach the roof and ends to the floor a little easier than the other way around. Of course, I figured this out on the fourth and final car! I now have a cabin car track fully stocked for building trains in the Irwin yard.

Lisa and the kids also gave me some other great gifts for the railroad - a couple of books by Tony Koester, some cinder block walls for scratchbuilding and Model Builder software to print builds and paste them to cardstock. I built Vic's Bait & Tackle from the downloadable sample. Looks like I'll be pretty busy the rest of the Christmas break.

Merry Christmas everyone!

Friday, December 23, 2011

Vic's Bait & Tackle - A Complete Scene

Today, I finished Vic's Bait & Tackle scene. I had built the building some time ago and placed it on the layout. The scene sort of developed from there. Named after my friend and co-worker, Vic W., who lives on the east coast and loves to fish,  I finally finished the supporting scenery adding trees, outhouses, and the fishermen Vic picked up from a hobby shop near his house.
East end of Irwin Yard
In the first photo, taken from the Irwin Yard looking eastward, we see the Irwin switcher pulling a set of hopper cars probably heading under the B&O bridge and taking them to the Westmoreland Coal Company mine in Herminie. One of the through freights, led by GP-7 #8805, is passing LAS Fabrics heading towards East McKeesport and then Pittsburgh. Just past the caboose, and in the shadow of the B&O bridge, you can see Vic's.
 In this view, you can see the details of the scene. The fishermen are swapping stories before they head to Keystone Lake which is down the road behind the yellow sedan. That's Vic on the hillside, practicing his casting with a new fly fishing pole. Gotta be able to tell the customers how it handles! Sitting on the porch, a young lady enjoys a Coca Cola, from the six pack at her feet. Behind Vic's you can see the his and hers (Goose and Gander) out houses. I found this Durango Press wood kit at T & K Hobby back in September and I knew that I HAD to add it to the scene. I finished it this morning, as well as the trees I needed and started putting it all together.
I had planned to add the trees and take a picture but the ground between the tracks was still bare so I added some grass. Well, the area between this scene and LAS Fabrics needs some grass too. And the end of the Irwin yard area looked really bare. You get the idea. I spent about 90 minutes adding grass to various areas for the photo and I could not stop myself. I am very happy that I finally finished this scene!

Thursday, November 24, 2011

Clearing the workbench

Happy Thanksgiving, everyone! I had some time today before we visited family for Thanksgiving dinner so I decided to clear off the workbench by completing a few projects that I have moved 4 or 5 (dozen) times. First, I renumbered a duplicate PRR boxcar. I had some old decals that would match so I carefully cut out three new numbers (743) and watched them dissolve in the water! Hmmm. Guess 25+ years in the drawer will do that to decals. I once read a trick is to spray them with Dullcote to extend their life ... add that to the next train show list! I ended up with a 7, partial 4, and after two attempts freehand painted the 3! Oh, and on one side of the car only .. fortunately I do not have a loop or wye on the layout.

Next, I scratch built a coal bunker from scale 4"x6" and 6"x6" lumber. Once it drys, I'll stain it, weather it and then place it on the layout behind Dailey's Coal and Fuel Oil with a mound of coal and a front loader (add THAT to the shopping list!) and this scene will be complete!

I had a couple more cars on the bench to finish. I started working on the H33 covered hopper car. I very quickly realized the instruction sheet I had in the box was not correct. Ploughing ahead, I was missing several key pieces and had glued two pieces in the wrong order. Other than that ... I put that box back in the rolling stock kit drawer. Hey, I've waited 5 or 8 years to finish that project, what's another few?

Building the Red Caboose P&LE boxcar was much smoother. I had instructions ... and the right ones! This is a pretty detailed kit and I was gluing individual grab irons, stirrups and brake lines. While I appreciate the level of detail in a kit like this, I also no that even I won't notice it once I have it on the layout, and I doubt others will either.I think I prefer the kits where you add a brake wheel, the trucks and couplers ... then run it on the layout!

Overall a good thanksgiving ... and I have some space back on the workbench. For the moment.

Tuesday, November 22, 2011

Tuesday Progress

I made some serious progress tonight, but first an observation.

Insulators on HO scale telephone poles are small. Really, really small. Ten per crosspiece, 36 crosspieces ... lots of little insulators to paint green. Yes, I painted 360 insulators green and 36 vertical supports white. I picked up these Rix Products telephones at T&K Hobby a few weeks ago for along the Route 30 overpass. I decided I wanted to get them ready tonight ... right after my left arm took out the one detailed telephone that was actually mounted on the layout. Grrrrrrr.

The telephone pole calamity happened because I was running trains back and forth and I solved one of the problems we had with the 3 operator scenario on Sunday. I need a timetable. I know this sounds obvious but I realized the best way for the mainline operators to work is to know ahead of time (1) through or local freight and (2) who goes next. Following the PRR rules of eastbound trains having superiority, I determined tonight that we can start the operating session with a westbound through or local from Greensburg that has to layover in the Irwin yard passing siding until the westbound through train from Pittsburgh passes. If its a local (still working this part out), he can drop some cars and continue on to Pittsburgh.

I need to work out each aspect of the operations in isolation and then when Eric and Jack are here, we can connect the sequence. I have a plan! I also did a little research tonight - really, just started this part - into some real freight trains from the PRR circa 1955-ish. For example, there was an eastbound Cincinnati, OH to Enola yard (Harrisburg, PA area) train with the symbol CIN-2 and known as "The Captivator". In the opposite direction, CIN-2 or "The Rocket" ran westbound from Enola to Cincinnati. I think with names and a specified sequence, the operating session will only get better.

And I was doing more tonight. Basically, I dabbled here and there. There is now a roof mounted tank on LAS Fabrics and two fuel oil tanks at Dailey's Coal and Fuel Oil. In fact, around Dailey's I completed a stone road to the building  and fixed some of the grass area. I only need to build the partial coal bunker and this little scene will be complete.

And on the other side of the layout, I added some details to Vic's Bait & Tackle scene. I had added a short stair case a couple of weeks ago and finished the gravel road and parking area. I added a girl sitting on a bench on the porch with a six pack of soda at her feet and a kerosene pump and propane tank around the building. I completed the grass and dirt scenery and started added some bushes, trees and a couple of tree stumps. I have an outhouse kit that I need to build, plus more trees and bushes and this scene will be done. Well ... almost done. I decide to give the impression of a barn yard between this scene and LAS Fabrics so I want to added a split rail fence and finish weathering the B&O trestle bridge - which Vic's sits in the shadow of - and THEN it will be complete.

I think I can call tonight progress. Stay tuned, I think I will get some serious work done this week!

Monday, November 21, 2011

Three Operators

Yesterday, I held an operating session for the first time with 3 operators. Both Eric and Jack had a couple of operating sessions under their belt and I had 3 throttles so it was time to up the ante. Jack had not seen the layout in a while so I walked him through the changes in West Staging and the Rt 30 overpass. I gave him a DT-402 and put him in charge of the eastbound traffic coming from Pittsburgh (West Staging).

Eric took the other DT-402 throttle and handled the westbound traffic (from East Staging / Greensburg). Again, we basically alternated traffic rather than run to a schedule. While this more or less worked, Jack commented at the end of the session that it was helpful to know ahead of time the sequence of trains. We did a little work with the P&LE interchange but never brought out the train that was on the P&LE staging track. Jack handled this train and had become pretty good at switching East McKeesport but I again failed to work in the West Penn Power or May Stern spurs.

I took the new UT-4 throttle and my usual job as Irwin yardmaster. I like the UT-4 for this situation where I am using a single engine and don't have to change addresses. I am not crazy about the hardware reverse switch as opposed to the soft switches in the DT-402s.

One of the challenges I've had before is trying to switch the industries in Irwin and on the Herminie mine spur from the Irwin yard. While Eric was waiting for Jack to move an eastbound local, I had him switch the Heinz and LAS Fabrics spurs. I pulled the cars from mine but left empty tracks for a while until I could take the next train over. Not ideal. An we missed the Irwin Industries track again.

Overall the session was a success. I only had about 90 minutes before the session to get things staged and I pulled a few cars (good move) and quickly arranged the staged trains (not-so-good, should have been more careful in the makeup of a couple of the trains). The Irwin yard became the choke point and a couple of times both mainline operators were waiting for the yardmaster - me! - to get caught up.

On the positive, the layout easily supports 3 people. I definitely need to fix the spotty track and make sure all the cars on the layout meet specs. Most of the bad orders are gondolas or hoppers that are underweight. I have too many freight cars to leave these on the tracks. Finally, I need a specific train sequence before the next operating session.

Getting closer.