Friday, June 19, 2015

June Progress

I've had a rare week of free evenings and have bee working on several projects at the same time. First, I painted the hill for Route 30 and built another bridge section, which I had recently purchased at T & K Hobby. A quick test fit and the bridge is still short - meaning buying another section! Last night I was looking for some plastic supplies and discovered a half with enough pieces to create another section of bridge. HA! Here I thought the original bridge I build for the old layout, two sections long, was all that I purchased. I had purchased a kit to make three sections. Sweet! 
I have also been scratch building the GSS Cabinet factory in Uniontown PA. Of course, this is named after my father and it will have a small, lit interior display of some wood working tools and, naturally, a figure of Dad working one of the machines. I am almost done with the basic structure and will post a photo when its complete. 
Last time Bruce visited, we did some hill sculpting and plastering. I created the basic shape for the hill supporting the north end of Route 30 and painted it. Recently, I had an interesting idea for how to finish the scenery in this odd little corner and I was even able to find DPM's Kelly's Saloon at a hobby store in Harrisburg PA that was exactly what I was looking. I may have to rename it Clancy's! Below is the initial mockup of the scene and I think I like it.
A couple of buildings to help mask this end of East McKeesport
My next step is to install a retaining wall under Rt 30 and finish the scenery the hillside and area behind the two buildings. I may also install the piers for the bridge and cut it to length. Maybe.

Saturday, May 2, 2015

Pennsy Running Again

The Pennsylvania Railroad (PRR or Pennsy) Irwin District is running again. Bruce came over today and the trains were running pretty well, except west bound on the inside mainline. A kink at the liftout bridge will require serious rip and replace of the track crossing the cut at the liftout. Bruce's eyes, not to mention his experience and perspective, were instrumental at finding solutions for the problems I have been encountering.
With the trains running much more reliably, we were able to go through a couple of switching maneuvers. This was a new experience for Bruce and a lot of fun for me. He more or less replicated the test run I had done, picking up (p/u) and setting out (s/o) cars at Dailey Fuel & Coal Oil in Uniontown as well and working (both p.u and s/o) the siding for LAS Fabrics in Greensburg. By watching how Bruce worked the train and noting the ideas in my head that he did not realize, I was able to come up with a plan for operating the entire layout and note the things I will have to point out to my non-train buddies when I have them over to operate.
We have already decided that the next time Bruce comes over, we are going to tackle the mountains (OK, hills) and finish the scenery on those. He also had an interesting idea to finish the scene between Uniontown and Irwin Yard that should blend the view-block a little better into the scenery.
I have ideas on how to finish the industries (PPG, Heinz and another yet to be named) behind the Irwin yard. And after Bruce left, I had a brilliant idea for masking the other corner of layout to with a building based on the old May Stern Furniture Co. building but it will have to be a different name since that company is already on the layout in a different location.
So many ideas....so much to do...I love it!

Tuesday, April 28, 2015

Working out the kinks

Over the winter, I could run two trains...kind of. The outer mainline could only run counterclockwise while the inside main could only run clockwise. If I changed directions, there were 3 or 4 spots - on each track! - where I would inevitably derail. So I spent some time working on the trouble spots over the weekend, focusing on them one at a time until eventually I was able to get the trains to run continuously, either direction, with only intermittent issues. Still seems like I might be getting some voltage drops along the line but I will wait on that issue.
Last night, while the trains were making their rounds, I spent some time reorganizing the car cards. Every time I had derail, I would first swap out cars to see if it was the track or the car. Over time, this lead to the matching car card to be in any box BUT the one representing the track where the car actually sat. I ended up needed to create some new cards too since I had built a half dozen freight cars over the Christmas break but forgot to create the cards.
While the train on the outer loop ran, I decided to try a switching job using the inner train which was facing Eastbound. The first issue is the switch leading into Herminie, another case where there is a slight gap in the point which can derail cars, The second issue appeared when I pulled the hoppers out of mine siding and the engine derailed - apparently the distance between the rails on the curve out of Herminie is just too much for the engine to handle, and this was my big RS-3 not the SW-1!
On a more positive note, switching LAS Fabrics in Greensburg went off with no problems but hand a couple derails going back to the Irwin Yard because this was the first time I had run several of these cars on the mainline.
Car Maintenance team is going to be extra busy this week!

Thursday, February 19, 2015

Quiet Time

Not a lot has been happening on the layout over the last few weeks for a couple reasons. First, it is really, really cold outside and the layout room is an unheated room off the garage. True, I have a space heater that will eventually warm things up but the trains are sluggish in the cold and it takes some time to warm up. Second, with the electrical issue I've encountered in the mainline passing through Irwin Yard, I have been discouraged.  I think I know how to fix it but to do the job right, I need to get some solder flux which I have been having trouble locating. Finally, we have been on vacation for the last week and of course, could not spend any time in the train room.
Hopefully I will get back in there soon.

Sunday, January 11, 2015

Bruce helps find the problem

Bruce and I have been trying to meet over the Christmas holidays so we could review the process on the layout he designed. We never did get together over the holidays but we both finally had a free Sunday afternoon so he dropped by today. Last time he saw the layout, the trains were running but it was all cork, track and scene dividers. Now, there is actually scenery, if somewhat temporary.
A couple weeks ago, I started having a problem with the trains running and I could not figure out why. With Bruce's help today, we finally isolated where the problem is...although not why.

Point where both trains stop
Oddly enough, the problem occurs if an engine on the inside main (does not matter which engine) is just east (right) of all the yard switches AND the engine (any engine) is approaching the entrance to the west yard, both trains stop. We think it has something to do with the fact that there is only one feeder to this whole section so maybe the two engines are drawing too much current (voltage??) and neither can run. Next week I plan to drop at least 2 new feeders, one on either track and see if that improves the performance.
On a funny note, I pointed out to Bruce that my Repair-In-Place, or RIP, track can hold 4 freight cars that are not running well on the layout. That was not enough, so I started placing RIP cars on West Yard #3 right behind the RIP and maintenance shed. Now that is full with 4 freight cars and 1 cabin car. Worse, doing our running today, a second cabin car kept derailing but at least I was able to squeeze it onto the RIP track.
RIP Track full, so is West Yard #3!
Looks like the Maintenance Dept better get cracking!


Tuesday, December 23, 2014

Some Scenery

Had to take a break from the layout for a while so progress has been limited to an hour stolen here and one there. The twins and I went to the train show in Springfield and I bought an interlocking tower and the end track bumper for Herminie. I am (sortof) taking a couple of weeks vacation over the holidays and last night I spent the evening adding some grass to the Irwin Yard and Herminie.
Irwin Yard getting some landscaping
 Today, I added some people, trees and stumps to help bring the scene to life.
Westnmoreland Coal Company Mine No. 4
Tonight, Adam and Nicholas can into the train room to run trains and make sure we can fit 3 operators inside the layout. It worked out pretty well. My enthusiasm to work on the layout is so we can have some friends from St. Helen come over and see the trains - their son is a huge train fan!
Adam (background) and Nicholas running trains with Dad

Sunday, November 30, 2014

Busy Thanksgiving

Hope all my friends had a good Thanksgiving, I sure did. Turkey, stuffing and all the fixings spending time with Lisa's family and a couple of days with Dad, Cathy and her family. In between, I got a lot of work on the railroad.
First, I put all the fascia back up, this time permanently. I had thought of cutting new fascia since there were a lot of screw holes from the old but I decided it was OK. I did have to paint 3 pieces of lighting valances that I reused for fascia. With the front of the layout having two sides I needed more green masonite than previously and likewise, with the train against 3 walls, I needed less sky blue ones. I mounted all the throttle and waybill holders as well as the Digitrax UP5 and UR90 panels.
Most of this was done before we headed to PA to visit Dad. On the way, I was able to stop at T&K Hobby in Bridgeport OH with my shopping list. I did not get the fine ballast I was looking for but a few things I was not able to find at the train shows this fall - rubber tipped tweezers, a Zona saw and 2 soft handle XActo knives. I also stocked up on a few Polly S paints (including Aged Concrete) and the last rail stop for the supply track at the mine. It's heavy timbers in a pile of ballast. Will look great.
Finally, I was able to rough in the mountains around the tunnel portals in Manor and Herminie. With different portals - one concrete and one stone - it looks like 2 different tunnels. Things are coming along very nicely. I even have a plan for operations where the city will be E. McKeesport for west bound traffic from Irwin servicing two sidings and Jeannette for east bound traffic servicing one spur.
Tnnnel portal at Herminie

Manor tunnel portal passes behind Dailey's Coal & Fuel and Keystone Sand & Supply